  "name": "How long does it take to construct an accessory dwelling unit?",
  "description": "Project timelines depend on whether it is a conversion or new build, with duration influenced by site planning, permitting, utility rough-ins, drywall installat",
  "url": "https://baycityremodeling.com/faq/how-long-does-it-take-to-construct-an-accessory-dwelling-unit",
  "mainEntity": [
    {
      "@type": "Question",
      "name": "How long does it take to construct an accessory dwelling unit?",
      "acceptedAnswer": {
        "@type": "Answer",
        "text": "Building an ADU involves several distinct phases: design consultation, site planning, permitting, foundation and framing, MEP (mechanical, electrical, and plumbing) rough-ins, drywall, and finish installation. The overall schedule varies based on whether the unit is an attached addition, a garage conversion, or ground-up new construction. Project complexity changes significantly if trenching underground utility lines across the yard is required, or if the main electrical panel must be upgraded to support a secondary kitchen and water heater. Weather, permitting review times, and material lead times also influence completion schedules.",
        "description": "Project timelines depend on whether it is a conversion or new build, with duration influenced by site planning, permitting, utility rough-ins, drywall installation, and finishes."
      }
    }
  ],
  "speakable": {
    "@type": "SpeakableSpecification",
    "cssSelector": [
      "h1",
      ".faq-question",
      ".faq-answer",
      "[itemprop=\"acceptedAnswer\"]"
    ]
  }
}